Peri, a manufacturer and supplier of formwork and scaffolding systems, will for the first time in the Middle introduce the type-tested Peri Up Rosett Flex modular scaffolding system at Middle East Concrete (MEC) 2011 taking place at the Dubai International Exhibition Centre this month.

Utilised for industrial, petrochemical and oil and gas projects, the system fulfils the requirements for these particularly challenging projects. The company highlighted that Peri UP Rosett Flex offers maximum flexibility in scaffolding construction and has integrated safety features, which allows the same components to be used as shoring, stair towers, suspended scaffold, reinforcement scaffold or working platforms. This results in reduction of on-site material requirements and increased material utilisation rates.

Self-securing and convenient
The industrial decks are self-securing and can be mounted at any position within the scaffold on standard ledgers. The main components of Peri Up Rosett Flex, such as standards, ledgers and decks, have a uniform length and width grid arrangement of 25 cm or 50 cm. Therefore the system can be adapted to suit almost any geometrical form. Peri Up Rosett Flex can be erected quickly and efficiently, it is extremely versatile and fulfils the highest levels of safety requirements, the company stressed.

As well as Peri Up, the company said it would showcase a number of other products it is famous for. Professionals would be treated to a wealth of information at its stall including intensive discussions with its experts, tours of the exhibited products, latest documentation and live product demonstrations highlighting the advantages of Peri products.

It will present proven system equipment, solid product enhancements and numerous new developments, the company stated.

“With interactive live demonstration and product experts from Germany, Peri will demonstrate how easy it is to erect Peri Skydeck, the light-weight aluminium panel slab formwork for faster assembly. Equipped with a drophead, early striking is possible after only one day (depending on the slab thickness and concrete strength). On-site material requirements can be reduced as the beams and panels are then available for the next concreting cycle.”

 Peri will showcase its products at the MEC 2011 from November 21 to 24 at the Dubai International Exhibition Centre in the Saeed Halls.